CASE STUDIES

Big Problems, Bigger Solutions. See How We Did It.

NEW CASE STUDY
CRYOGENIC VALVE MODIFICATION

3× life, 83% Faster, 1/3 the Cost, Zero leakage

A main ship-to-shore isolation valve was leaking every three months and taking half a year to repair overseas. Anthis found the design flaw the original manufacturer missed, re-engineered it, and returned zero-leakage performance, delivered locally in under a month.

Two large lng tanks on a barge with cran